July 8th, 2019 10:16 PM #861
I did consider these alternatives, but the problem was the skill required to put these up. Sayang ang bilis nito if hindi sanay ang tao mo gumamit nito, lalabas na mas mabilis sila sa nakasanayan nilang chb. Another problem here is that the plumbing and electricals should be well planned kasi dapat naka layout na bago bugahan ng concrete. Mas mahirap gumawa ng changes sa layout vs chb.
I did a combination of formblocks and chb as I wanted minimal abala sa neighbor ko where my firewall is located, but nakita ko sa actual na mas mabilis sila sa chb kaysa sa formblocks, anyway the time savings here is because I didn't need to plaster anymore and there were no electricals or plumbing on this side.
-
Tsikoteer
- Join Date
- Feb 2003
- Posts
- 1,038
July 19th, 2019 05:41 PM #862Thanks guys....looks like this will be a good alternative...if makakakuha lang ng builder na sanay na dun sa method of constructing with that material. Very good insulation both acoustic and heat. Very keen on getting direct hand experience.
-
September 2nd, 2019 11:07 PM #863
Just saw the duragates sliding cantilever gate, but looks expensive, are there local manufacturers here?
-
September 2nd, 2019 11:40 PM #864
There are local custom gate manufacturers who can do cantilever gates, automated or manual. You may have to source your own Comunello tracks & rollers, if you wish em, papi sir. Our go-to fabricator here overbuilds his rollers & has his custom top guide wheels rubber treaded. These are time tested to remain smooth & light....Never saw the need to go Comunello.[emoji108]
Sent from my SM-G970F using Tapatalk
-
October 9th, 2019 03:32 PM #865
Bros, where can I get a copy of the certificate of occupancy? I'm expanding our garage. Need to apply building permit pero requirement yung occupancy permit. Wala kaming copy nun, since na turnover from subdivision developer. We inquired sa head office ng developer sabi sa subdivision admin daw pero wala rin silang kopya.
-
Verified Tsikot Member
- Join Date
- Oct 2014
- Posts
- 1,232
October 9th, 2019 03:42 PM #866
-
October 9th, 2019 04:09 PM #867
-
October 9th, 2019 04:16 PM #868
Edit, kuha ko na acronyms Office of the Building Official, City Engineering Office, Municipal Engineering Office. Will try sa kanila.
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 53,883
October 10th, 2019 09:51 AM #869
-
October 19th, 2019 03:31 PM #870
As expected, in response to Tesla’s entry into the Philippines market, Ford will be bringing in the...