Results 21 to 30 of 30
-
August 2nd, 2014 06:06 PM #21
Oo nga. Now looking at sept 15 for the start of the project... Now, will that overflow into Nov 1? Heavy traffic iyan!!! Kung after Nov 1, overflow naman sa Christmas... Next year na iyan!!! :hysterical:
-
Tsikoteer
- Join Date
- Nov 2013
- Posts
- 2,077
August 2nd, 2014 07:20 PM #22Sana naman maayos ang mga alternate routes. Grabe traffic nyan badtrip!
Posted via Tsikot Mobile App
-
August 2nd, 2014 07:44 PM #23
Ang mahirap magkasabay yung magallanes at sucat kahit imove ang date. yung magallanes 200days ang repair. grabe ang traffic pag Friday sana mag disc yung skyway kahit paano maka tulong yun.
Posted via Tsikot Mobile App
-
August 3rd, 2014 04:21 PM #24
-
Tsikoteer
- Join Date
- Nov 2013
- Posts
- 2,077
August 4th, 2014 10:00 AM #25
-
Tsikoteer
- Join Date
- Nov 2013
- Posts
- 2,077
August 4th, 2014 10:03 AM #26ayan on hold indefinitely na daw.
"MMDA Traffic Engineering Center head Noemie Recio said in an interview during the agency’s Sunday radio program on dzBB, that the closure of the bridge’s three eastbound lanes to pave the way for its retrofitting would not push through for now.
We are not against the project. We just want the DPWH and the contractor to guarantee that there is a proper traffic management plan which includes the alternate routes for motorists and the vehicle volume count [for the] road,” Recio added"
Sucat bridge repair put on hold while rerouting being prepared | Motioncars
-
August 4th, 2014 10:25 AM #27
Considering that the retrofitting is to address the safety issue, what if (knock on wood, huwag naman sana mangyari) something happen's , who will take the responsibility??? For god sake, surely MMDA & Mayor will be quick to wash their hands. For heaven's sake, how long does it take for these 3 agencies to get their heads together and come up with a fix (i'm sure it won't last 12 hrs) rather than kanya-kanya silang press release for 4 days now. Mga putong inah nila taong gobierno nga sila
-
August 4th, 2014 04:43 PM #28
-
August 5th, 2014 02:18 PM #29
-
August 5th, 2014 02:23 PM #30
Huwag naman sanang mangyari bro... Pero, nata-traffic din kami sa ibabaw ng bridge, while waiting for the intersection to free up>>>> from those coming from East Service Road, from Putatan, Muntinlupa and those turning left to Sucat from SLEX northbound exit>>> where we turn left merging with SLEX northbound....
Ipagbawal na sana nila ang mga buses at trucks na mag-cross ng Sucat Interchange Bridge....
“Familiarity breeds awe”
23.9K:thud:
As expected, in response to Tesla’s entry into the Philippines market, Ford will be bringing in the...
Tesla Philippines