    50T was high pre-covid? ... but now materials cost more? ... not sure ... used to be 25T-30T was minimum ...

    On another note ... how much do build and sell usually mark up? ...

  2. Join Date
    Jan 2016
    Posts
    6,771
    #572
    Mine was done at 25k pre COVID. My neighbor was quoted 30k after lockdown but was revised to 35k due to inflation, this is basic finish.

  3. Join Date
    Oct 2002
    Posts
    21,373
    #573
    Depende pa din sa location ng project.

    Labor in NCR is higher, also with gravel and sand.
    Signature

  4. Join Date
    Mar 2004
    Posts
    10,213
    #574
    Aren't materials more expensive the farther away from NCR you are ... additional shipping cost ...

  5. Join Date
    Oct 2002
    Posts
    21,373
    #575
    Quote Originally Posted by Walter View Post
    Aren't materials more expensive the farther away from NCR you are ... additional shipping cost ...
    Depends on the material and where you’re located. Cements and wood come from the provinces. Shipping cost for other materials might be negligible. But with labor costing as much as 30-40% of the project, that is significant.
    Signature

  6. Join Date
    Jul 2007
    Posts
    57,241
    #576
    Quote Originally Posted by Walter View Post
    Aren't materials more expensive the farther away from NCR you are ... additional shipping cost ...
    that's what happened to our house in the province, it's slightly more expensive than Manila.

  7. Join Date
    Oct 2002
    Posts
    21,373
    #577
    Quote Originally Posted by _Cathy_ View Post
    that's what happened to our house in the province, it's slightly more expensive than Manila.
    First time ko nakarinig ng ganyan.

    Unless yung workers lahat galing din ng Manila.
    Signature

  8. Join Date
    Nov 2017
    Posts
    287
    #578
    Mas cheaper pa din sa province nung nagpagawa ako ng vacation haus late 2020 to 2021, kumuha ako ng separate contractor for the whole roof trusses structure using thicker gauge roofing, significantly cheaper compare sa Manila.

    Solid narra door na custom size na height and width, 6 in total, sobrang mura compare sa Manila.


    Sent from my iPhone using Tapatalk

  9. Join Date
    Jul 2007
    Posts
    57,241
    #579
    Quote Originally Posted by boybi View Post
    First time ko nakarinig ng ganyan.

    Unless yung workers lahat galing din ng Manila.
    No, province. I meant the materials

    Totoo ba ngayon na ang singil ng electrician per "butas" like outlet or switch? Papalitan kasi yung mga outlet/switch sa bahay namin sa province and he said P300 each e total of 31 yun We haven't had any electrical work done in our house in Manila e yung mga little things yung all around na namin gumagawa

  10. Join Date
    Jan 2016
    Posts
    6,771
    #580
    Quote Originally Posted by _Cathy_ View Post
    No, province. I meant the materials

    Totoo ba ngayon na ang singil ng electrician per "butas" like outlet or switch? Papalitan kasi yung mga outlet/switch sa bahay namin sa province and he said P300 each e total of 31 yun We haven't had any electrical work done in our house in Manila e yung mga little things yung all around na namin gumagawa
    Yes, per butas but usually that price means he will lay down all the wires, pipes etc. as in full lay out ng electrical system ng under construction na bahay. Pag simple palit lang ng outlet or switch much much less because pwede palitan ang isa in 10 minutes or less. let's say na 15 minutes na, so 4 in 1 hour, in 8 hours, that's 32 outlets. No one's going to pay 9300 kesos for that hehe. I would give it to him for 1000 lahat na. That's generous na given na hindi kailangan electrician ang magpalit nyan. But still better to get an electrician just in case things pop up that only an electrician can solve right away.