    Quote Originally Posted by _Cathy_ View Post
    concrete



    It's just one long wall. 5 days gagawin. Nagulat lang ako sa cost ng pag paint ngayon Puro algae na kasi yung wall e
    yep! paint isnt cheap, especially the branded ones. 5 days? hmm. might be a lot of cleaning and surface prep if thats the case.

  2. Join Date
    Jul 2007
    Posts
    57,241
    #592
    I need to have part of our perimeter cemented because I want to move my treadmill in that area. It's currently grass. To get there you need to pass the garden so I am afraid that it might flood if I don't get a good contractor. And since I only want a small part of the perimeter, there will be a grass area again. The left side of the wall has bamboo, yung right side wall na ng bahay namin. I don't know the width of our perimeter basta yung standard lang.

    Yung contractor ko kasi mahal sumingil pero pulido. He recommended paving blocks para makatipid. His estimate last year was Paving block P12 x 1000 = P12000 + labor P4800 + sand P1500 = P18300. Pwede na yun?

  3. Join Date
    Mar 2013
    Posts
    6,160
    #593
    Yep that's decent. At least you trust him to enter your house.

  4. Join Date
    Feb 2009
    Posts
    5,142
    #594
    It's just one long wall. 5 days gagawin. Nagulat lang ako sa cost ng pag paint ngayon Puro algae na kasi yung wall



    If there is history of algae and mildew, add a corresponding amount of mildewcide to the paint prior to application

  5. Join Date
    Sep 2003
    Posts
    786
    #595
    Happy New Year ka Tsikots!!! Need help from here.

    Naghahanap po ako ng contractor for my House. A 100sqm 2 sty house. Location po is near Southwoods Exit. Please PM me for more details.

    Maraming salamat po.

    You can contact me also at : bong722*yahoo.com

  6. Join Date
    Jan 2016
    Posts
    3
    #596
    patulong naman po..may contractor na po kami para sa papagawa naming house sagot din nila yung architect..gusto ko lang po i-confirm kung ok yung mga materials na nakalagay dito sa BOM na binigay nila. wala po kasi ako masyadong alam s mga materyales sa bahay.

    kung may comment po kayo or suggestion it will help me a lot.

    pasensya na kung mahaba..salamat in advance

    EARTHWORKS
    a. Excavation
    b. Backfilling/Compaction
    c. Gravel Bed
    d. Anti-Termite (pre-construction)

    FORMWORKS
    a. Coco Lumber2"x3"x10'
    b. Plywood 3/8" thk (10mm thk)
    c. Metal Deck 0.80mm thk
    d. Assorted CW Nails

    DEFORMED REINFORCING BARS
    a. DRB 16mm*φ x 6m
    b. DRB 12mm*φ x 6m
    c. DRB 10mm*φ x 6m
    d. GI Wire # 16
    e. Consummables

    CONCRETE WORKS
    a. Portland Cement
    b. Washsand
    c. Gravel 3/4

    MASONRY WORKS
    a. CHB 4" thk (Internal)
    b. CHB 5" thk (External)
    c. Portland Cement
    d. Washsand
    e. Def. Rebar 10mm φ
    f. GI Wire # 16

    PLASTERING WORKS
    a. Portland Cement
    b. Vibrosand

    DOORS & WINDOWS
    a. D-1* 0.90 x 2.10 Panel Door
    b. D-2* 0.80 x 2.10 Panel Door
    c. D-3* 0.80 x 2.10 Panel Door
    d. D-4* 0.70 x 2.10 Panel Door
    e. D-5* 2.80 x 2.10 Sliding Alum Door
    f. D-6 1.40 x 2.10 Sliding Alum Door
    g. Door Jambs 2" x 4"
    h. W-1* 1.20 x 1.20m Alum powder coated
    i. W-2* 0.60 x 1.20m Alum Powder coated
    j. W-3* 1.20 x 0.90m Alum Powder coated
    k. W-4* 1.20 x 0.90m Alum Powder coated
    l. Inlet Screen

    CEILING WORKS
    a. Hardiflex 4.5mm thk
    b. Metal Furring Double
    c. Carrying Channel
    d. Consummables

    ROOF FRAMING & ROOFING
    a. Angle Bar 3/16" thk x 2" x 2"
    b. Cee Purlin 2" x 3" 1.2mm
    c. Cee Purlin 2" x 4" 1.2mm
    d. 12mm sag rod
    e. Welding Rod 1/8
    f. Marine Plywood 1/2" thk 4' x 8"
    g. Asphalt Roof Shingles (requirement ng subdivision)
    h. Consummables

    FLOOR & WALL FINISHES
    a. Ceramic Floor Tiles
    b. CR Floor Tiles
    c. CR Wall Tiles
    d. Tile Adhesive 25kg/bag
    e. Tile Grout 5kg/bag
    f. Washsand
    g. Cement

    BUILT-IN CABINETS
    a. 3/4" thk Plyboard
    b. KD S4S 1/2 x 2 x 8
    c. Granite Slab Kit Counter
    d. Consummables
    e. Wooden Baseboard

    PLUMBING WORKS - ROUGH-INS SANITARY
    a. HCG Watercloset
    b. HCG Lavatory set
    c. Shower Head and Valve Set
    d. Faucet
    e. Kitchen sink and Faucet
    f. Floor Drain 4" x 4"
    g. PVC Pipe 4" φ S1000 - Sanitary
    h. PVC Pipe Fittings - Sanitary
    i. HCG Bathtub

    CONST OF SEPTIC TANK
    a. Excavation
    b. Hollow Blocks 4" thk
    c. DRB 10mm φ x 6m
    d. PVC Pipe Fittings - Sanitary
    e. Portland Cement
    f. Washsand

    ELECTRICAL WORKS
    a. Service Entrance
    b. Panelboard
    c. THWWire 5.5 mm2
    d. THWWire 14 mm2
    e. THWWire 3.5 mm2
    f. PVC Pipe 20mm
    g. Utility/Junction boxes
    h. Receptacle 4" x 4"
    i. Convenience Outlet
    j. Switches
    k. Consummables

    STORM DRAINAGE SYSTEM
    a. PVC Pipe 3" φ S1000 - Sanitary
    b. Area Drain / Catch Basin

    PAINTING WORKS
    a. Semi Gloss Latex Finish
    b. Elastomeric Paint - Exterior Wall
    c. Flat Latex Paint Finish
    d. Ducco Paint Finish
    e. QDE Paint Finish

  7. Join Date
    Jan 2012
    Posts
    1,703
    #597
    Quote Originally Posted by alaejos1223 View Post
    patulong naman po..may contractor na po kami para sa papagawa naming house sagot din nila yung architect..gusto ko lang po i-confirm kung ok yung mga materials na nakalagay dito sa BOM na binigay nila. wala po kasi ako masyadong alam s mga materyales sa bahay.

    kung may comment po kayo or suggestion it will help me a lot.

    pasensya na kung mahaba..salamat in advance

    EARTHWORKS
    a.Excavation
    b.Backfilling/Compaction
    c.Gravel Bed
    d.Anti-Termite (pre-construction)

    FORMWORKS
    a.Coco Lumber2"x3"x10'
    b.Plywood 3/8" thk (10mm thk)
    c.Metal Deck 0.80mm thk
    d.Assorted CW Nails

    DEFORMED REINFORCING BARS
    a.DRB 16mm*φ x 6m
    b.DRB 12mm*φ x 6m
    c.DRB 10mm*φ x 6m
    d.GI Wire # 16
    e.Consummables

    CONCRETE WORKS
    a.Portland Cement
    b.Washsand
    c.Gravel 3/4

    MASONRY WORKS
    a.CHB 4" thk (Internal)
    b.CHB 5" thk (External)
    c.Portland Cement
    d.Washsand
    e.Def. Rebar 10mm φ
    f.GI Wire # 16

    PLASTERING WORKS
    a.Portland Cement
    b.Vibrosand

    DOORS & WINDOWS
    a.D-1* 0.90 x 2.10 Panel Door
    b.D-2* 0.80 x 2.10 Panel Door
    c.D-3* 0.80 x 2.10 Panel Door
    d.D-4* 0.70 x 2.10 Panel Door
    e.D-5* 2.80 x 2.10 Sliding Alum Door
    f.D-6 1.40 x 2.10 Sliding Alum Door
    g.Door Jambs 2" x 4"
    h.W-1* 1.20 x 1.20m Alum powder coated
    i.W-2* 0.60 x 1.20m Alum Powder coated
    j.W-3* 1.20 x 0.90m Alum Powder coated
    k.W-4* 1.20 x 0.90m Alum Powder coated
    l.Inlet Screen

    CEILING WORKS
    a.Hardiflex 4.5mm thk
    b.Metal Furring Double
    c.Carrying Channel
    d.Consummables

    ROOF FRAMING & ROOFING
    a.Angle Bar 3/16" thk x 2" x 2"
    b.Cee Purlin 2" x 3" 1.2mm
    c.Cee Purlin 2" x 4" 1.2mm
    d.12mm sag rod
    e.Welding Rod 1/8
    f.Marine Plywood 1/2" thk 4' x 8"
    g.Asphalt Roof Shingles (requirement ng subdivision)
    h.Consummables

    FLOOR & WALL FINISHES
    a.Ceramic Floor Tiles
    b.CR Floor Tiles
    c.CR Wall Tiles
    d.Tile Adhesive 25kg/bag
    e.Tile Grout 5kg/bag
    f.Washsand
    g.Cement

    BUILT-IN CABINETS
    a.3/4" thk Plyboard
    b.KD S4S 1/2 x 2 x 8
    c.Granite Slab Kit Counter
    d.Consummables
    e.Wooden Baseboard

    PLUMBING WORKS - ROUGH-INS SANITARY
    a.HCG Watercloset
    b.HCG Lavatory set
    c.Shower Head and Valve Set
    d.Faucet
    e.Kitchen sink and Faucet
    f.Floor Drain 4" x 4"
    g.PVC Pipe 4" φ S1000 - Sanitary
    h.PVC Pipe Fittings - Sanitary
    i.HCG Bathtub

    CONST OF SEPTIC TANK
    a.Excavation
    b.Hollow Blocks 4" thk
    c.DRB 10mm φ x 6m
    d.PVC Pipe Fittings - Sanitary
    e.Portland Cement
    f.Washsand

    ELECTRICAL WORKS
    a.Service Entrance
    b.Panelboard
    c.THWWire 5.5 mm2
    d.THWWire 14 mm2
    e.THWWire 3.5 mm2
    f.PVC Pipe 20mm
    g.Utility/Junction boxes
    h.Receptacle 4" x 4"
    i.Convenience Outlet
    j.Switches
    k.Consummables

    STORM DRAINAGE SYSTEM
    a.PVC Pipe 3" φ S1000 - Sanitary
    b.Area Drain / Catch Basin

    PAINTING WORKS
    a.Semi Gloss Latex Finish
    b.Elastomeric Paint - Exterior Wall
    c.Flat Latex Paint Finish
    d.Ducco Paint Finish
    e.QDE Paint Finish
    Normal specs for an average house. Try to compare it with the architectural specs

  8. Join Date
    Mar 2015
    Posts
    991
    #598
    Bale ito yun mga materials na gagamitin po sa construction sir pero d naman po naka indicate yun quantity at description nang work po. General lang po ito. Dapat po araw araw nyo tignan yun ginagawa at kausapin nyo yun foreman sa site. Tignan nyo lang na d po tinipid sa materyales sir at sa halo nang cement. Baka po malabnaw.

    Dami po kasing detalye yan sir mahirap lahat isa isahin po. Mas maganda po lagi nyo puntahan para mabantayan nyo mabuti yun ginagawa po

  9. Join Date
    Apr 2015
    Posts
    104
    #599
    ^^^Ung quantity ng excavation ng septic tank, hindi pa ba kasama sa quantity ng excavation sa earthworks?

    Regarding tile works, saan gagamitin ang tile adhesive, kasi may cement pa, kung kailangan pang i level ang floor area gagamitin ang cement at sand, and ussually cement na rin ang gagamitin pang set ng tiles kasabay na ang trabaho nyan habang ni lelevel ang floor area, karaniwan ung adhessive ginagamit pag nasa level na ang floor or wall. at kadalasan kahit naka rough finish na ang wall pwede na ang cement pang setting ng tiles. mas mahal ata ang tile adhessive kesa sa cement?

  10. Join Date
    Apr 2015
    Posts
    104
    #600
    Sa sanitary line parang kailangan mo pa ng 2"dia na pipe para sa kitchen sink at lavatory pati na vent pipe. Napansin ko rin na walang nabanggit na materials para sa cold water line o drinking water line o baka naka lump sum na.

    Ung door jamb mo parang maliit, considering na 4" na ang chb mo sa interior plus plastering. At sa exterior wall mo 5" ang chb plus plastering. Hindi mag pa flush sa wall thickness ang door jamb size, opinyon ko lang pangit tingnan.