so anybody know wtf they're building right before the filinvest exit? are they just doing road widening thing or something else entirely? parang christmas traffic kanina eh, afternoon na meron pa din counterflow.
-
Verified Tsikot Member
- Join Date
- Feb 2015
- Posts
- 174
July 30th, 2019 10:56 PM #2
-
Verified Tsikot Member
- Join Date
- Jun 2018
- Posts
- 1,475
July 30th, 2019 11:35 PM #3
-
July 30th, 2019 11:40 PM #4
Extension daw ng skyway to Susana heights.
Sent from my iPhone using Tapatalk
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 53,883
-
July 31st, 2019 05:20 AM #6
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 53,883
July 31st, 2019 07:36 AM #7
-
Verified Tsikot Member
- Join Date
- Jan 2017
- Posts
- 43
July 31st, 2019 11:12 AM #8it's Skyway extension.....
kamot ulo na lang ako kung bakit di pa nila ginawa yan while they're working the Alabang segment.
kung inayos na lang kaya nila noon hanggang Alabang na ang entry at exit, tapos Susana na ang dulo.
...realizing now the Amkor ramp (entry/exit) naging bottleneck north and south bound.
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 53,883
July 31st, 2019 11:19 AM #9napakatagal na po yang extension thru the metro na yan. hindi ko na nga matandaan kung kelan... but i do remember, they promised it would be finished within 2 years.
sa aking paningin,
ang prublema kung bakit nagka-tagal-tagal yan, ay dahil hindi muna nila inayos yung mga masasagasaang rights of way.
kung inayos muna nila yon, before even hukaying the first shovelful, in less than 2 years ay tapos yan.
which was what the original schedule promised.Last edited by dr. d; July 31st, 2019 at 11:28 AM.
-
July 31st, 2019 11:44 AM #10