traffic northbound kanina dahil sa quezon ave exit yata
Sent from my Redmi Note 9 Pro using Tsikot Forums mobile app
-
January 29th, 2021 12:07 AM #172
-
January 29th, 2021 01:10 AM #173
-
Tsikoteer
- Join Date
- Mar 2013
- Posts
- 6,160
January 29th, 2021 02:16 PM #174From skyscrapercity thread
Dpwh view and open street view.
Sent from my SM-N975F using Tsikot Forums mobile app
-
January 29th, 2021 03:51 PM #175
-
January 29th, 2021 03:55 PM #176
Thanks for sharing bro. So it basically extends the on-ramp from the current Quirino/SLEX intersection to Nagtahan cor. Magsaysay?
I don't understand the need for it since it's essentially a second level above the exact same route underneath. It will clear up the traffic on the Quirino extension but will just move it to the flyover before Nagtahan bridge.
Sent from my SM-N970F using Tapatalk
-
January 29th, 2021 04:50 PM #177
https://www.************/2021/01/smc...wGHoYw9F1U&m=1
Sent from my iPhone using Tapatalk
-
January 29th, 2021 05:38 PM #178
This is Skyway Stage 3 Section 2A’: Tomas Claudio - PUP, Sta. Mesa connection aka "common alignment" for MVP's NLEx-SLEx Connector Road to physically connect with RSA's Skyway Stage 3 / Skyway system in general.
As per their agreement signed during the past Administration, RSA will build this alignment and MVP will reimburse construction costs once completed.
PS: while certified truck grade ang Connector Road, wala padin advisory if RSA will allow Class 3 to utilize Stage 3 / Skyway - if cannot be, most probably exit ang trucks sa Sta. Mesa tapos at-grade going to Quirino / SLEx na ulit.
-
Tsikoteer
- Join Date
- Mar 2013
- Posts
- 6,160
January 30th, 2021 07:17 AM #179I think when this connector road is done...the c5 truck traffic jams will be reduced. Thats what i hope anyways.