Bataan–Cavite Interlink Bridge
Manila Bay Bridge: Here's what Bataan-Cavite Interlink will look like | Autoindustriya
DPWH: Detailed engineering design of Bataan-Cavite Interlink Bridge now 34% complete | TopGear PH
During the first inter-agency steering committee held recently, it was announced that the design work for the flagship infrastructure project is 34% complete as of February 2022.The entire BCIB will cost P175.7 billion to build. The four-lane bridge will span 32.15km. It will start at Barangay Alas-asin in Mariveles, Bataan, cross Manila Bay, and end at Barangay Timalan in Naic, Cavite. Once the bridge is completed, motorists will supposedly be able to drive from one end to another in 20-30 minutes.
-
March 3rd, 2022 04:24 PM #2
-
March 3rd, 2022 05:07 PM #3
-
Tsikoteer
- Join Date
- Jun 2009
- Posts
- 838
March 3rd, 2022 10:25 PM #4They need to extend cavitex or calax all the way to naic for this to be reqlly viable.
Sent from my iPhone using Tapatalk
-
Tsikoteer
- Join Date
- Jul 2013
- Posts
- 2,450
March 4th, 2022 09:56 AM #5Malalim ba ang Manila Bay?
Naalala ko once napadaan yung field trip bus namin sa Tokyo Aqua Line (underground highway sa Tokyo Bay). May rest area na parang island sa gitna.
-
Tsikot Member Rank 3
- Join Date
- Nov 2002
- Posts
- 1,770
-
-
Verified Tsikot Member
- Join Date
- Sep 2021
- Posts
- 872
March 4th, 2022 01:45 PM #8Ah, that one in Chiba? Was planning to join a marathon held there every 2 yrs- part of the route goes through the Aqua Line.
Asa pa tayo here in da Pilipins.
Pwera lang siguro if a local politician known for real estate develops property na mag benefit by such a route. Mabilis pa sa alas4 magawan ng paraan gumawa ng daanan...
-
Tsikoteer
- Join Date
- Jul 2013
- Posts
- 2,450
March 4th, 2022 03:27 PM #9
-
July 15th, 2024 09:48 AM #10
Construction of Bataan-Cavite Interlink Bridge moved to 2025 | Autoindustriya
DPWh announced that construction for the Bataan-Cavite Interlink Bridge has been moved to early/mid-2025. According to DPWH Undersecretary Maria Catalina Cabral, the delay in the construction of the said bridge was due to the government taking its time in looking for the best financing package available.