Results 351 to 360 of 397
-
-
December 28th, 2017 12:51 PM #352
-
December 15th, 2019 12:58 PM #353
TPLEx Sison to Rosario v.v. segment soft opening today 15 Dec 2019 for Yuletide madness
IMPORTANT advisory: Pozorrubio to Sison is still not passable as of today
---
Pinoy Joyride
· 3 hrs ·
GOOD NEWS! #TPLEX Sison to Rosario segment will be TEMPORARILY open LATER today December 15, 2019 to motorist FREE OF CHARGE. From Barangay Cauringan Sison Pangasinan towards terminus at Subusub Rosario La Union. No need to use the narrow Bued bridge along MacArthur Highway.
NOTE: If you are going to Baguio from Manila / TPLEX, you have to exit at Pozorrubio and drive to MacArthur Highway, then turn left at the Sison temporary entry towards Rosario using the Sison - Rosario segment. The Pozorrubio to Sison segment is still not passable.
Have a safe journey! Enjoy the holidays!
Padalhan niyo naman ako ng strawberry jam ah ahihihi!
Last edited by absinthe; December 15th, 2019 at 01:11 PM.
-
December 16th, 2019 12:25 PM #354
Updated video:
dmitrivalencia
35.1K subscribers
There was a soft opening or dry run of the TPLEX - Rosario to Sison segment yesterday December 15, 2019. The Junction of Pugo Rosario Rd and MacArthur Highway was transformed into a rotunda (which is still incomplete as of this posting). The Rosario - Sison section is 5.93 km long, while the 5.5 km Sison to Pozorrubio segment is still under construction. Hopefully early next year we can see a full opening of this new segment of #TPLEX
Toll is free!
From MacArthur Highway (Northbound) you turn left to the temporary entry / exit of Sison then drive all the way to Rosario passing the beautiful Bued viaduct towards Rosario main toll plaza ending at the terminus which is the Rosario rotunda, if you are to go to Kennon Road turn right to the rotunda, while if you are going to Marcos highway, take the second turn while the third goes to Damortis and Rosario bayan.
NOTE:
Important Advisory: The Pozorrubio to Sison segment is still (under contruction) as not passable as of this posting. Motorist have to exit at Pozorrubio interchange towards MacArthur Highway before gaining access to Sison interchange. This is to bypass the MacArthur Highway - narrow Bued bridge
Merry Christmas everyone! Safe driving, observe proper speed limits and safe journey!
#TarlacPangasinanLaUnionExpressway #PIDC
Special thanks to Private Infra Dev Corporation and SMC Tollways
#DMCI #JEMCO #DSI
-
June 16th, 2020 08:49 PM #355
Finishing works nalang tapos na TPLEx: DPWH announces TPLEX completion within the year
Gov't should fast-track approval of Phase 2 aka San Juan, L.U. extension.
-
Tsikoteer
- Join Date
- Jul 2009
- Posts
- 2,618
June 16th, 2020 08:52 PM #356
-
-
June 23rd, 2020 11:27 AM #358
Per news today: 10% in September
Baguio eyes opening tourism by September —Magalong
Published June 23, 2020 9:38am
Baguio City is eyeing to open its tourism industry and economy by September, Mayor Benjamin Magalong said on Tuesday.
In a television interview, Magalong noted that opening the City of Pines to tourists would also depend on the situation of nearby regions.
"Based on our timeline, we will open up our economy and tourism sometime in September with the assumption that things normalize in NCR, Region III and Region IV," Magalong said on ANC.
xxx
"This time, when we open up, it's just like applying for a visa and that's precisely what we're doing right now with returning Baguio residents... You know the best way to do it is probably to start with about 10% and then start to learn the dynamics of it," Magalong explained.
"Once we're used to managing the 10% and learn the dynamics of it, we start to increase it... 20%, 30%, 40%," he added.
-
Tsikoteer
- Join Date
- Jul 2009
- Posts
- 2,618
June 23rd, 2020 11:44 AM #359
-
July 9th, 2020 11:58 PM #360
Swabe na punta mo nun boss if all-clear na by that time as the final section of TPLEx Phase 1 is opening on 15 July 2020. [Sison IC to follow].
This is it, the last update before the opening of #TPLEX #TarlacPangasinanLaUnionExpressway
As of this update there are ongoing works on the Sison Interchange. The July 15 opening probably must be the main carriageway from Pozorrubio to Rosario. I guess the Sison toll plaza and Interchange will be operating in the coming months. I have nothing more to say except the road condition was superb! Asphalt was good! It was a great drive!
I wanted to congratulate #SMCTPLEXCorpration and #SMCInfrastructure for this wonderful expressway. This expressway has benefited many motorists going to the north. Truly it was a big help to ease up traffic and a big convenience for vehicle travel. Most of all, a big salute and thanks to the people in the construction team of TPLEX as they have made miracles over this project despite the covid19 pandemic and time constraint and other issues. Thank you very much SMC!
As expected, in response to Tesla’s entry into the Philippines market, Ford will be bringing in the...
Tesla Philippines